Post-Construction Site Inspection <2500SF

$125.00

Post-Construction - To visually assess the property after construction or renovation is complete, confirming that work is finished, accessible, and damage-free.

Post-Construction - To visually assess the property after construction or renovation is complete, confirming that work is finished, accessible, and damage-free.

⚠️ Legal Disclaimer

"This inspection is a visual, non-code, non-licensed review performed by OCR Reports & Compliance, LLC. It does not replace official city or county inspections required for occupancy certification or code compliance."

Purpose & Scope

  • A visual assessment to confirm the project is completed per the agreed scope of work.

  • Identify punch list items, visible defects, or safety concerns.

  • Ensure the site is clean, accessible, and ready for occupancy, turnover, or listing.

  • Not a replacement for code inspections or final certificate of occupancy (CO).

🗂️ Key Inspection Areas

1. Site Cleanliness & Final Grading

  • Trash, nails, construction debris removed.

  • Final grading directs water away from foundation.

  • No erosion or drainage concerns post-build.

  • Sod, mulch, or landscape stabilization completed per plan.

2. Driveways, Walkways & Access

  • Concrete/asphalt is properly poured, crack-free.

  • Entry points (stairs, sidewalks) are level and trip hazard-free.

3. Exterior Building Envelope

  • Siding, brick, or stucco completed with no gaps or damage.

  • Gutters, downspouts, and rooflines aligned and functioning.

  • Paint and finishes complete and uniform.

4. Doors & Windows

  • All installed and sealed.

  • Operate properly (no sticking or gaps).

  • Screens, locks, and weatherstripping in place.

5. Utilities & Equipment

  • HVAC units, meters, backflow preventers, and exterior lighting installed.

  • Exterior outlets GFCI protected and operable.

  • Gas/electric/water meters secured and accessible.

6. Garage & Outbuildings (if applicable)

  • Garage door functional with opener installed.

  • No damage to drywall, ceiling, or floors.

  • Detached structures complete and secure.

7. Interior Spot Checks (if permitted)

  • Walls and ceilings have no visible damage.

  • Flooring is clean, damage-free, and installed properly.

  • Smoke detectors, light switches, and visible plumbing functioning (visual test only).

  • No leaks, odors, or visible mold signs.

8. Final Safety Review

  • Handrails, guards, and steps installed securely.

  • No protruding nails, unsecured hardware, or hazards.

  • Fire extinguishers or signs installed (if commercial).

9. Punch List Identification

  • Note any incomplete, damaged, or improperly installed items.

  • Mark locations with tape/flags and document with photos.